Production shutdown
A badly prepared shutdown or drawdown costs more than the job itself. The schedule is set with the operator before the first dive.
Screens, gates, intakes and stoplogs, down to sixty-nine metres.
On a hydropower scheme, every day of shutdown counts as lost production. We prepare the job with your operator so that we dive at the planned time, work without surprises and hand the structure back on the announced date.
A badly prepared shutdown or drawdown costs more than the job itself. The schedule is set with the operator before the first dive.
Suction, residual flow, equipment under pressure: a dive in a hydraulic structure only starts once every component is isolated and checked.
An owner who hands diving work to a non-compliant contractor shares the risk if there is an accident. Ask for the proof before the job, not after.
Reservoirs, intakes and power plants in Switzerland, Germany, Austria and France, in the mountains and in the lowlands.
We come and look at the structure. You receive a written work plan, a date and a price, fitted to your operations.
A daily update. Every dive is measured and recorded as it happens.
A report: the condition of the structure, what was done, what will need a further intervention and when.
Tell us where it is and what is wrong with it. We will come and see it.